電纜橋架不同角度是怎么進行連接的

橋架直線段之間、直線段與彎通、變徑直通之間的連接件,應采用橋架制造廠配套的連接件。連接件薄鋼板厚度不應小于橋架薄鋼板厚度。接口應平整,無扭曲、凸起和凹陷,連接用的半園頭鍍鋅螺栓,半園頭應在橋架內側,螺栓長度適當,擰緊之后,露出長度以2~5牙為宜。水平安裝的橋架,其直線段的連接頭,應盡量設在兩個支吊架之間的1/4左右處。
The connectors between the straight-line sections of the bridge, between the straight-line sections and the elbow and reducer shall be the connectors matched by the bridge manufacturer. The thickness of the connecting piece steel sheet shall not be less than that of the bridge steel sheet. The interface should be flat without distortion, bulge and depression. The half round head galvanized bolt used for connection should be on the inside of the bridge. The length of the bolt should be appropriate. After tightening, the exposed length should be 2 ~ 5 teeth. For the horizontally installed bridge, the connector of the straight section should be set at about 1/4 between the two supports and hangers as far as possible.
1.一般情況下不在施工現場制作橋架。由于特殊原因需要時,可利用現有的橋架改制非標準彎通和變徑直通。改制和切斷直線段橋架時,均不得用氣、電焊切割,應用專用切割工具。改制的橋架需要平整,及時補漆,面漆顏色應與其它橋架相近。
1. In general, bridges are not made on the construction site. When necessary for special reasons, the existing bridge can be used to reform non-standard elbow and reducing straight. When reforming and cutting the straight-line bridge, gas and electric welding shall not be used for cutting, and special cutting tools shall be used. The restructured cable tray needs to be leveled and painted in time, and the finish color should be similar to that of other cable trays.
2.橋架跨越建筑物的伸縮縫處,按GB50168規定,應設置伸縮縫,保證橋架及敷設在橋架內的電纜在建筑物伸縮不危及其本身時能自由伸縮,不受損壞。因為新建建筑物里,橋架安裝一般都在混凝土結構工程完成數月甚一年之后進行,混凝土收縮逐漸減小。伸縮量一般不會超過建筑物伸縮縫寬L。
2. At the expansion joints where the bridge crosses the building, expansion joints shall be set according to GB50168 to ensure that the bridge and the cables laid in the bridge can expand freely without damage when the expansion of the building does not endanger its own safety. Because in new buildings, the bridge installation is generally carried out months or even a year after the completion of the concrete structure project, and the concrete shrinkage gradually decreases. Generally, the expansion amount will not exceed the expansion joint width l of the building.
3.若發現或從土建單位了解到建筑物伸縮縫較大有可能超過L時,應按實際做好伸縮處理。要跨越伸縮縫的橋架少一側有較長的直線段,宜超過30m,或伸縮縫兩側直線段橋架相加有30m,中間無水平或垂直彎通。以便于在橋架中留電纜(或電線)的伸縮余量,這個余量應大于伸縮縫寬L。
3. If it is found or learned from the civil engineering unit that the expansion joint of the building is large and may exceed L, the expansion treatment shall be carried out according to the actual situation. At least one side of the bridge to cross the expansion joint has a long straight-line segment, which should be more than 30m, or the sum of the straight-line segments on both sides of the expansion joint is 30m, and there is no horizontal or vertical bend in the middle. In order to reserve the expansion allowance of cables (or wires) in the bridge, this allowance should be greater than the expansion joint width L.
以上就是為大家介紹的有關濟南電纜橋架的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯系我們.我們將以的態度,為您提供服務http://www.euup.cn
The above is a detailed introduction about Jinan cable tray, which I hope will be helpful to you If you have any questions, please contact us We will provide you with professional service http://www.euup.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 国产成人3p视频免费观看 | 中文字幕一区在线观看 | 日韩欧免费一区二区三区 | 久久久久久久久久久视频国内精品视频 | 欧美成人自拍 | 久草网在线 | 日本免费观看的视频在线 | 久久福利青草精品资源站免费 | 欧美+日本+国产+在线观看 | 精品国产网 | 一级毛片免费视频观看 | 免费看欧美一级特黄a毛片 免费看片aⅴ免费大片 | 国产欧美日韩综合精品一区二区三区 | 日本三级欧美三级人妇英文 | 成人免费观看国产高清 | 亚洲精品成人网久久久久久 | 国产呦系列免费 | 国产日韩欧美一区二区三区综合 | 在线91精品亚洲网站精品成人 | 欧美色另类| 色久网 | 高清国产露脸捆绑01经典 | 日日摸天天摸狠狠摸视频 | 在线播放第一页 | 久久一区二区三区免费播放 | 国产精品正在播放 | 国产伦精一区二区三区视频 | 免费一级欧美大片在线观看 | 三级免费毛片 | 亚洲欧美另类专区 | 欧美在线看欧美高清视频免费 | 亚洲精品欧美日韩 | 成人精品一区久久久久 | 久久99久久精品久久久久久 | 日韩欧一级毛片在线播无遮挡 | 欧美日韩不卡一区 | 国产精品久久毛片 | 欧美在线精品一区二区三区 | 国产黄三级三·级三级 | 91精品成人免费国产片 | 亚洲欧洲国产精品 |