電纜橋架安裝準(zhǔn)備工作和施工工藝等流程

我們在山東電纜橋架施工一定會(huì)遇到很多問題,接下來給大家總結(jié)一下準(zhǔn)備工作和施工工藝等流程。
We will certainly encounter many problems during the construction of cable tray in Shandong. Next, we will summarize the preparatory work and construction process.
一、準(zhǔn)備工作
1、 Preparation work
1、熟悉圖紙,與水暖、通風(fēng)、空調(diào)各協(xié)調(diào),確定電纜橋架安裝位置及走向,以保證各的管道均能安裝就位,排列布置合理,符合設(shè)計(jì)及施工規(guī)范要求;同時(shí)核算橋架及附件、配件的用量。
1. Be familiar with the drawings, coordinate with the plumbing, ventilation and air conditioning disciplines, and determine the installation position and direction of cable tray to ensure that the pipelines of all disciplines can be installed in place, arranged reasonably, and meet the requirements of design and construction specifications; Simultaneously calculate the usage of cable trays, accessories, and accessories.
2、安裝電纜橋架使用的主要機(jī)具:電工工具、沖擊鉆、手電鉆、臺(tái)鉆、高凳、卷尺、鋼鋸、線墜、粉線袋等。
2. Main machines and tools used for installing cable tray: electrician tools, impact drills, electric hand drills, bench drills, high stools, tape measures, hacksaws, wire pendants, pink wire bags, etc.
3、為方便安裝施工,保證質(zhì)量,各種特殊形狀的彎通、非標(biāo)準(zhǔn)件一律現(xiàn)場實(shí)測實(shí)量,并把外形尺寸及時(shí)提供給生產(chǎn)廠家,由生產(chǎn)廠家進(jìn)行工廠化加工,這樣既能保證工程安裝質(zhì)量,同時(shí)降低了現(xiàn)場工人的生產(chǎn)勞動(dòng)強(qiáng)度。
3. For the convenience of installation and construction, and to ensure quality, all special shaped bends and non-standard parts are measured on-site, and the external dimensions are provided to the manufacturer in a timely manner for factory processing. This not only ensures the installation quality of the project, but also reduces the production labor intensity of on-site workers.
4、橋架內(nèi)外應(yīng)光滑平整,無毛刺,無損傷電纜絕緣的凸起和尖角,不應(yīng)有扭曲、翹邊等變型現(xiàn)象。螺栓、墊圈、彈簧墊等配件均為鍍鋅件。
4. The inside and outside of the bridge should be smooth and flat, without burrs, protrusions and sharp corners that damage the cable insulation, and there should be no distortion, warping, or other deformation phenomena. Bolts, washers, spring washers, and other accessories are all galvanized parts.
5、配合土建的結(jié)構(gòu)施工,檢查確認(rèn)預(yù)留洞、預(yù)埋鐵的數(shù)量位置是否正確,有問題及時(shí)處理。
5. Cooperate with the structural construction of civil engineering, check and confirm whether the quantity and position of reserved holes and embedded iron are correct, and promptly handle any problems.
二、施工工藝
2、 Construction process
1、工藝流程
1. Process flow
彈線定位→膨脹螺栓安裝→立柱、吊支架和托臂安裝→電纜橋架安裝→電纜橋架接地
Snap line for positioning → install expansion bolt → install column, hanger bracket and bracket → install cable tray → ground cable tray
2、彈線定位
2. Snap line positioning
根據(jù)設(shè)計(jì)圖紙確定進(jìn)出線、盒、箱、柜等電氣器具的安裝位置,從始端終端找好水平線或垂直線,用粉線袋沿墻壁、頂棚等處,沿線路的線彈線;按照設(shè)計(jì)圖要求及施工驗(yàn)收規(guī)范規(guī)定,分勻檔距,并用筆標(biāo)出具體位置。
Determine the installation position of electrical appliances such as incoming and outgoing lines, boxes, boxes, cabinets, etc. according to the design drawings, and find horizontal or vertical lines from the beginning to the end. Use a pink line bag to snap lines along the wall, ceiling, etc. along the centerline of the line; According to the design drawings and construction acceptance specifications, divide the span evenly and mark the specific position with a pen.
3、水平橋架支、吊架、托臂的安裝,豎直橋架的支架安裝方法。
3. The installation of horizontal bridge supports, hangers, and brackets, as well as the installation method of vertical bridge supports.
(1)水平橋架(槽式)吊架安裝
(1) Installation of Horizontal Bridge (Trough) Hanger
(2)水平橋架(槽式)墻、立柱支架應(yīng)做成三角支撐型如下
(2) The horizontal bridge (trough type) wall and column supports should be made into triangular support types as follows
圖中水平臂與豎直臂等長,焊接為滿焊。靠墻或立柱側(cè)應(yīng)采用不少于兩處膨脹螺栓固定。其各項(xiàng)參數(shù)應(yīng)符合下表:
The horizontal arm and vertical arm in the figure are of equal length and are fully welded. The side against the wall or column should be fixed with at least two expansion bolts. Its various parameters should comply with the following table:
(3)豎直橋架(梯式)支架
(3) Vertical bridge (ladder type) support
山東電纜橋架
各項(xiàng)參數(shù)應(yīng)符合下列表格:
All parameters should comply with the following table:
4、水平橋架支、吊架、托臂的安裝,豎直橋架的支架安裝要點(diǎn)
4. The installation of horizontal bridge supports, hangers, and brackets, as well as the installation points of vertical bridge supports
(1)立柱、吊支架和托臂所用鋼材應(yīng)平直,無扭曲。下料后長短偏差應(yīng)在5mm范圍內(nèi),切口處應(yīng)無卷邊、毛刺。
(1) The steel used for columns, suspension brackets, and support arms should be straight and free from distortion. After cutting, the length deviation should be within 5mm, and there should be no curling or burrs at the incision.
(2)立柱、吊支架和托臂應(yīng)安裝牢固,無顯著變形,焊縫均勻平整,焊縫長度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊、焊漏等缺陷,焊后應(yīng)做好防腐處理。
(2) The columns, suspension brackets, and supporting arms should be installed firmly without significant deformation. The welds should be uniform and flat, and the length of the welds should meet the requirements. There should be no defects such as cracks, undercuts, pores, depressions, missed welds, or welding leaks. After welding, anti-corrosion treatment should be done well.
(3)立柱、吊支架和托臂的用料規(guī)格:嚴(yán)格按產(chǎn)品說明及橋架規(guī)格要求配置。
(3) Material specifications for columns, suspension brackets, and support arms: strictly follow the product instructions and bridge specifications for configuration.
(4)固定支點(diǎn)間距一般不大于1.5m-2.0m。在進(jìn)出接線盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以內(nèi)應(yīng)設(shè)置固定支持點(diǎn)。
(4) The spacing between fixed support points is generally not greater than 1.5m-2.0m. Fixed support points should be set up within 500mm of the two ends of the incoming and outgoing junction boxes, boxes, cabinets, corners, turning and deformation joints, as well as the three ends of the T-joint.
(5)立柱、吊支架和托臂距離上層樓板不應(yīng)小于150mm-200mm,距地面高度不應(yīng)低于100mm-150mm。
(5) The distance between columns, suspension brackets, and support arms from the upper floor slab should not be less than 150mm-200mm, and the height from the ground should not be less than 100mm-150mm.
電纜橋架安裝準(zhǔn)備工作和施工工藝等流程相關(guān)內(nèi)容就講解到這里了,希望能夠給您好的幫助,更多事項(xiàng)就來我們網(wǎng)站http://www.euup.cn咨詢吧!
This is the end of cable tray installation preparation and construction process. I hope I can help you. More information can be found on our website http://www.euup.cn Consult!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 亚洲欧美日韩久久精品第一区 | 国产亚洲一区二区三区在线 | 成网站在线观看人免费 | 久久成人动漫 | 毛片在线免费观看网站 | 亚洲成人免费在线观看 | 欧美成人免费高清网站 | aa级毛片 | 国产成人精品男人的天堂网站 | 亚洲视频网址 | 欧美性色生活片天天看99 | 国产精品亚欧美一区二区三区 | 国产亚洲欧美日韩国产片 | 一区二区国产精品 | 色女生影院 | 国产特黄特色一级特色大片 | 日韩一区二区不卡 | 国产午夜亚洲精品一区网站 | 久久国产一片免费观看 | 又粗又爽又色男女乱淫播放男女 | 亚洲午夜网 | 亚洲网站www | 波多野在线播放 | 免费黄网大全 | 亚欧视频在线 | 91久久亚洲国产成人精品性色 | 亚洲国产精 | freesex寂寞老妇hd | 99视频在线精品免费观看18 | 九九99香蕉在线视频免费 | 欧美在线播放成人a | 99精品视频在线观看免费 | 一区二区国产在线观看 | 在线视频一区二区 | 性久久久久久久久久 | 在线播放精品 | 麻豆国产视频 | 国产成人精品亚洲777图片 | 国产免费爱在线观看视频 | 失禁h啪肉尿出来高h男男 | 成人高清毛片a |